BuildX Capital is where I invest in and support early stage founders building across mobility, energy, trade, manufacturing, and physical infrastructure. The energy mandate, now in formation, is one part of it. It exists because power is the constraint sitting under everything else, and it is a dedicated vehicle for private capital in Nigeria's distributed commercial and industrial energy infrastructure.

Last updated

Over the past decade, I have built systems that help African businesses move money, verify identity, prevent fraud, and reach customers at scale. At Moniepoint, I helped build a distribution network that carried financial services into communities the traditional system did not serve well. At Prembly, I have worked on the trust layer that allows businesses to know who they are dealing with and transact with greater confidence. Alongside the operating work, I have spent years investing privately as an angel in companies building on top of Nigeria's physical constraints, and supporting other founders as they build.

Those experiences shaped a conviction. Digital infrastructure can remove enormous friction, but it cannot manufacture electricity. A payment rail, identity platform, factory, cold room, hospital, or data centre is only as reliable as the power beneath it. Nigeria has built remarkable businesses on top of an energy system that still asks each enterprise to become its own utility.

Backing that view one company at a time taught me where the constraint actually sits. An angel cheque can help a team prove a model, but it cannot finance the asset the model depends on, and the businesses that need power do not need another equity round. They need the equipment on site and a way to pay for it out of what it saves them. The energy mandate of BuildX Capital carries that learning, and the operating experience above, into a structured vehicle built for the assets themselves.

The energy mandate in detail

BuildX Capital's investing is not limited to energy. The rest of this page covers the energy mandate, because it is the part now being structured and it needs the most explanation.

The system is constrained, not the demand

Nigeria's grid has substantial nameplate capacity, but too little of it becomes dependable power for the customer. NERC's April 2026 operational factsheet reported 13,625 MW of installed grid-connected capacity. Only 4,286 MW was available for dispatch, and average output was approximately 4,048 MW. The issue is not simply how many generating plants exist. Fuel availability, plant condition, transmission limits, distribution losses, liquidity, and commercial discipline all determine what finally reaches a meter.

Access is also incomplete. The World Bank's latest published indicator places electricity access at 62.5 percent of the population in 2024. Its review of Nigeria's mini-grid market estimates that more than 80 million people still lack access. Businesses that are connected often face a different problem. Their connection does not guarantee the quality or duration of supply required to operate.

The practical result is a parallel energy economy. Companies buy generators, fuel, maintenance, inverters, batteries, and replacement equipment. They absorb downtime and voltage damage. These costs are dispersed across operating budgets, which can make them look temporary. In reality, they are a recurring payment for unreliable infrastructure.

13,625 MW

Installed grid capacity in April 2026

4,048 MW

Average grid output in April 2026

80M+

People estimated to remain without access

The investable wedge

The BuildX Capital energy mandate is being formed around distributed power for commercial and industrial users. The initial focus is not utility scale generation built on speculative demand. It is energy infrastructure located close to businesses that already consume power, already pay for alternatives, and can demonstrate the operating need to sign a credible long-term contract.

The systems may combine solar, storage, efficient backup, and energy management. The design follows the customer's load and site, not a technology preference. I am attached to dependable power, disciplined underwriting, and assets that solve a measured problem.

The commercial model is straightforward. A project company finances and operates the asset. The customer buys power or pays for availability under a contracted arrangement. The investment case comes from the spread between the customer's all-in cost of unreliable energy and the cost of delivering a more efficient service. That spread must be demonstrated at each site. It should never be assumed from a national average.

Productive mobility can become an anchor load

Across African cities, mobility is both an essential service and a source of income. Riders and small fleet operators already pay for fuel, maintenance, downtime, and vehicle access. Electrification can improve those economics, but the vehicle alone is not the infrastructure thesis. The investable system sits behind it. That system includes batteries, solar-enabled charging or swapping stations, controls, metering, maintenance, and software that makes energy use and payment performance visible.

The current operating test is deliberately small. Deployed electric bikes are actively tracked for utilisation, structured repayments, battery behaviour, and maintenance. There have been no payment defaults to date, although this is far too early to infer portfolio-level performance. The distributed station is the next underwriting question, not a proven result. The test is intended to establish its likely anchor load, collection behaviour, battery replacement needs, and the revenue supported by each unit of infrastructure capital before any claim of scale is made.

Why the timing has improved

Three conditions are converging. First, the cost and performance of distributed solar, storage, controls, and metering have improved. Second, customers understand the cost of unreliable power because they already carry it every month. Third, regulation is creating clearer routes for private generation.

Nigeria's 2026 mini-grid rules allow isolated projects up to 5 MW and interconnected projects up to 10 MW per site. The framework adds clearer site protection, grid-arrival provisions, portfolio applications, cost-reflective tariff methods, and defined approval timelines. Embedded generation remains another route for projects that supply through distribution infrastructure.

Public programmes are also validating the market rather than replacing it. The $750 million DARES programme targets electricity access for 17.5 million Nigerians through private sector-led distributed renewable energy. That is useful evidence of policy direction and market infrastructure. It is not a substitute for project-level commercial judgment.

How projects will be underwritten

The quality of the customer matters as much as the quality of the equipment. A technically sound asset can still be a poor investment if the buyer cannot pay, the contract is weak, the site lacks permits, or imported equipment creates an unmanaged currency mismatch.

The strategy begins with assets where demand is visible before capital is deployed. Priority users include operating businesses and economic clusters with steady loads, material power expenditure, and clear consequences when supply fails. Cold-chain facilities, light manufacturing, logistics, healthcare, hospitality, commercial property, digital infrastructure, and productive mobility fleets can fit this profile. Sector labels alone do not qualify a project.

The underwriting questions

  • Is the load measured, recurring, and large enough to support the asset?
  • What does the customer pay today across grid supply, fuel, maintenance, and downtime?
  • Can the customer honour a long-term contract through a full business cycle?
  • Are tariff adjustment, inflation, and currency risks allocated clearly?
  • Does the site have defensible rights, permits, interconnection terms, and insurance?
  • Can equipment be maintained locally and replaced without extended downtime?
  • Can the anchor load support the asset without relying on future demand?
  • For battery-based systems, do utilisation, useful life, replacement reserves, and maintenance support the return?
  • Is there a credible path to refinance, sell, or hold the asset for contracted cash yield?

Where the return should come from

The return should come from contracted cash flow and operational improvement, not from hoping that scarce infrastructure becomes fashionable. A well-structured asset can reduce a customer's energy cost, improve uptime, and make expenditure more predictable. The project captures part of that value through a power purchase, energy service, lease, or availability agreement.

When demand comes from a mobility or operating platform, the energy assets must remain identifiable and governed by a clear commercial agreement. The use or availability of those assets should repay the infrastructure capital. The investment should not depend on the operating company achieving a higher future valuation. This separation allows new categories of productive demand to qualify without weakening the fund's discipline.

This is why the strategy begins with commercial and industrial anchor loads. The IEA notes that businesses consume nearly three times more energy per mini-grid connection than households. Productive users provide the demand density that makes distributed systems more financeable while supporting wider economic activity.

The risks are real

Nigeria's need for power does not make every power project investable. Currency depreciation can raise equipment and debt costs. Customers can weaken. Regulation can move across federal and state jurisdictions. Tariff assumptions can fail. Equipment can underperform. Gas or diesel supply can be interrupted. Community, land, security, and interconnection issues can delay an otherwise sound project.

The response is not optimism. It is structure. Match currency where possible. Use conservative generation and collection assumptions. Require appropriate customer security. Stage capital against milestones. Diversify by customer and location. Insure what can be insured. Monitor every asset. Preserve step-in rights. Build contracts that explain what happens when the world does not follow the base case.

What the energy fund is not

It is not a bet that one technology will solve Nigeria's power sector. It is not a collection of speculative sites waiting for customers. It is not dependent on a single subsidy programme. It is not an attempt to rebuild the national grid privately.

Why I am building it

The conviction behind BuildX Capital is simple. When electricity is reliable, a factory can add a shift, a clinic can protect its cold chain, and a logistics operator can plan. I want to build infrastructure whose usefulness is visible in the cash flow of the businesses it powers.

Formation and execution

The energy fund is currently sponsor-led by me, drawing on a decade of building in African markets.

Formation includes assembling the investment and operating capability required for the mandate. No project should advance without accountable expertise across development, engineering, contracts, regulation, construction, asset management, and finance. The named team and governance structure will be published as those roles are formalised.

Get in touch

BuildX Capital is backing founders now. Its energy mandate is still in formation, and nothing on this page is an offer. I am glad to hear from:

  • Founders and operators with a viable site, productive fleet, anchor load, or technology platform with measurable energy demand.
  • Delivery partners who can contribute distribution, technology, equipment, development, or execution.
  • Investors and institutions interested in following the work. Any future offering would be made only to eligible investors, through formal documents.

Sources and scope

Figures are drawn from the latest primary or institutional sources available on the update date. Project economics vary by customer, location, technology, financing, and contract.

  1. 1. NERC Operational Performance FactsheetsInstalled capacity, available capacity, and average grid output
  2. 2. NERC Annual Report 2024Generation licensing and embedded power frameworks
  3. 3. NERC Mini-Grid Regulations 2026Current capacity thresholds and investment protections
  4. 4. World Bank Nigeria dataNational electricity access rate
  5. 5. World Bank mini-grid market reviewElectricity access gap and private mini-grid deployment
  6. 6. Nigeria DARES programmePublic support for private distributed renewable energy
  7. 7. IEA financing electricity access in AfricaAnchor loads, productive users, and private capital

This thesis is provided for discussion and information. It is not an offer to sell or a solicitation to purchase any security.